2 Shifts&Charger Twice Per Shift
By simulating different shifts and charging scenarios, the calculator allows users to analyze energy consumption, setting time, and device utilization.
Home » 2 Shifts&Charger Twice Per Shift
① → ② → ③ → ④
Shift | Li-ion battery charging node | Time format: 24h[XX:XX] ③ | Time span from last time point [h] | Li-ion SOC ④ | Lead-acid battery & energy consumption ① | |||
1st Shift | 1st shift begins | 6:00 | 0 | 1 | 100 | Voltage(V) | 80 | |
1st round charging starts | 08:48 | 2.8 | 0.3625 | 36.2500 | Lead acid capacity(ah) | 425 | ||
1st round charging finishes | 9:15 | 0.5 | 0.5791 | 57.9106 | Lead acid total working time from 20%-100% SOC(h) | 5 | ||
2nd round charging starts | 11:00 | 1.75 | 0.1734 | 17.3425 | Lead acid discharging depth | 0.8 | ||
2nd round charging finishes | 11:43 | 0.7167 | 0.4983 | 49.8334 | Lead acid effienicy | 0.75 | ||
1st shift finishes | 14:00 | 2.2833 | Over Discharge | 0 | Total energy released by lead acid (kwh) | 20.4 | ||
2nd Shift | 2nd shift begins | 14:00 | 0 | Over Discharge | 0 | Energy Consumption(kwh/h) | 4.08 | |
1st round charging starts | 16:48 | 2.8 | Over Discharge | 0 | ||||
1st round charging finishes | 17:00 | 0.2000 | 0.1083 | 10.8303 | Li-ion Battery ② | |||
2nd round charging starts | 19:03 | 2.05 | Over Discharge | 0 | Voltage(V) | 83.2 | ||
2nd round charging finishes | 19:45 | 0.7 | 0.3249 | 32.4910 | Li-ion capacity(ah) | 277 | ||
2nd shift finishes | 23:00 | 3.25 | Over Discharge | 0 | Total energy released by Li-ion(kwh) | 17.6 | ||
Next day 1st shift begins | 6:00 | 7 | 1 | 100 | Li-ion discharging depth | 0.85 | ||
Li-ion effienicy | 0.9 | |||||||
"Remark: Manual input is required in the green areas. The current content is an example." | Charging current of Li-ion battery(A) | 120 | ||||||
Shift time: The closing time of the last shift is the same as the starting time of the following change. | Total charging time of li-ion battery from 0% to 100%(h) | 2.3083 |